Pages

Friday, 18 February 2011

This is what I have been doing!


This is part of my use up and clear out campaign!

Wednesday, 9 February 2011

sickness and craft!

The last couple of weeks have been a little strained with at least one child of sick from school every week.

Therefore I have had a lot of time to craft rather than work I have been finishing stuff off and making new. I am trying to use up stuff in the house to make life easier when we move!

I have made two necklaces, two bracelets, a messenger bag and am working really hard on my crochet blanket!

Very soon I should have a proper website not just my folksy shop.

Monday, 17 January 2011

New Begininngs!

Well December has been and gone and January is now already half way through. Working for the Church during Advent and Christmas is manic! So much so, that I am now sick of In the Bleak Mid Winter and very glad I don't have to hear it until at least November!

On the home front I have made a decision that I am desperately trying to uphold not buying any more craft things until I have used up some of things which are currently taking up space here in the house! So I have already starting working on presents for Christmas 2011!

The house is looking clearer and every week I seem to be clearing more and more stuff and getting those silly little boxes which were full of stuff empty. I do worry that I am putting things into landfill, I try to recycle/freecycle/upcycle as much as I can but equally these things are taking up space in a very small house. Other exciting things are taking place and I will update everyone on them as soon as I can.

Craft wise I am in the process of making a messenger type bag and a cushion cover and have already made Mitts for my mum and dad to keep there hands warm whilst they work in their workshop making spinning wheels!






Right time to go and have another cuppa whilst I work on finishing another craft project!

Wednesday, 24 November 2010


Mini Hot Water Bottle Cover


8mm Needles

1 ball of “Fontana” Scarf Knitting wool

(Bulky Weight/12ply/7wpi)

Cast on 32 stitches

Rows 1-25 stocking stitch starting with a knit row

Row 26 (Purl 2 together yarn over) to end of row.

Row 27 -32 Stocking Stitch.

Row 33 cast off.

Cut a length of the remaining wool and make a twisted cord to be threaded through the eyelets, make a knot in each end of cord then thread through the eyelets.

Put mini hot water bottle in cover then tie the cord off.


Copyright Siân Lawton @2010 May be used free of charge. Selling without prior written consent prohibited. Obtain permission before redistributing. In all cases this notice must remain intact.


Wednesday, 13 October 2010

And I am back!

Wow what a long break that was with a large portion of the time not able to be connect to the internet!

Well we are in our new house and starting to get settled in. We must be I have started making stuff! Such as this great Christmas Card with a digistamp from Digisparkle



!

Thursday, 19 August 2010

Normal Service will be resumed ASAP

Well as the title says Normal service will resume as soon as possbile.

The fact is that we are moving and it is pure chaos! Dh has a bew job so we are moving to Dorset so he can take up the position of Parish Assitant in a lovel village church!

I will post photos up when I can.

see you all soon!